Sl.No | Name of the Range | YEAR | Location (Village/Town/RF Etc) | Name of the Scheme | Type of Plantation | Area (Ha. /Rkm) | Seedlings Planted |
---|---|---|---|---|---|---|---|
1 | Barbil | 2021-22 | Beleipada to Bhagalpur | Diversion of 0.654 ha forest land under jurisdiction for laying 32′ dia Iron Ore slurry pipeline system for transportation of 30MTPA Iron ore on non-RoW area by M/s JSW Utkal Steel Ltd. Bileipada – Bhagalpur | Avenue | 0.88 | 220 |
2 | Barbil | 2022-23 | Ulibutu RF | Diversion of 21.52 ha forest land in Bagiaburu Iron Mines of M/s OMDC Ltd [PCA RDF at Ulibutu RF] | ANR @200 | 43.04 | 8608 |
3 | Barbil | 2022-23 | 100 mtr Outer perimeter of ML area | Diversion of 360.01 ha forest land in Katamati Iron Mines of M/s Tata Steel Ltd. [Gap at 100 mtr Outer perimeter of ML area] | ANR @200 | 7.6 | 1520 |
4 | Barbil | 2023-24 | Lasarda to Gamalei | MGNREGA Avenue | Avenue | 4 | 1000 |
5 | Barbil | 2023-24 | Kanarda to Badjal | MGNREGA Avenue | Avenue | 6 | 1500 |
6 | Barbil | 2023-24 | Kankadapat to Anseikala | MGNREGA Avenue | Avenue | 6 | 1500 |
7 | Barbil | 2023-24 | Kendudihi Naik Sahi to Kendudihi Nua Sahi | MGNREGA Avenue | Avenue | 6 | 1500 |
8 | Barbil | 2023-24 | Tankura to Murga | MGNREGA Avenue | Avenue | 6 | 1500 |
9 | Barbil | 2024-25 | SZ area | Bolani Iron Mines by M/ SAIL, SZ area | SZ ANR @600 | 40.6 | 24360 |
10 | Barbil | 2024-25 | Purusottampur | CSR by OMC | AR @1600 | 5 | 8000 |
11 | Barbil | 2024-25 | Nalda-Kara | MGNREGA | Avenue | 5 | 1250 |
12 | Barbil | 2024-25 | Kandara (A) RF | SDMF | Tala Plantation | 66 | 66 |
13 | Barbil | 2024-25 | Karo RF | SDMF | Tala Plantation | 2334 | 2334 |
14 | Barbil | 2024-25 | Siddhamath RF | SDMF | Tala Plantation | 2634 | 2634 |
15 | Barbil | 2024-25 | Uliburu RF | SDMF | Tala Plantation | 966 | 966 |
16 | Barbil | 2024-25 | Karo RF near Kolhapanduli | SSWLCP | Siali @200 | 25 | 5000 |
17 | Barbil | 2024-25 | Uliburu RF near Gosala | SSWLCP | Sala @500 | 10 | 5000 |
18 | Barbil | 2024-25 | Uliburu RF near Gosala | SSWLCP | Ficus | 0 | 100 |
Total | 67058 |
Sl.No | Name of the Range | YEAR | Location (Village/Town/RF Etc) | Name of the Scheme | Type of Plantation | Area (Ha. /Rkm) | Seedlings Planted |
---|---|---|---|---|---|---|---|
1 | BJP | 2021-22 | Panasuan -Panasuan K.F | AJY CAMPA | ANR | 25 | 5000 |
2 | BJP | 2021-22 | Sundra -Sundra VF | AJY CAMPA | ANR | 50 | 10000 |
3 | BJP | 2021-22 | Kadalibadi -Kadalibadi VF | AJY CAMPA | ANR | 25 | 5000 |
4 | BJP | 2022-23 | Podadihi | Diversion of 120.838 ha forest land under section 2(ii) and for approval of 126.401 ha under section 2(iii) of FC Act,1980 in Ghoraburhani- Segasahi Iron Mines by M/s Essar Steel India Ltd, now M/s Arcelor Mittal Nippon India [CA RDF at Podadihi] | ANR @200 | 120.838 | 24168 |
5 | BJP | 2022-23 | Lungajhar | Diversion of 35.507 ha forest land for construction of 132 KV transmission line from 132/33 KV OPTCL grid station at Barbil to Kanando Steel Plant by M/s Rungta Mines Ltd. [CA Baldhill at Lungajhar] | Baldhill @1000 | 32.261 | 32261 |
6 | BJP | 2022-23 | Champajhar | Diversion of 21.52 ha forest land in Bagiaburu Iron Mines of M/s OMDC Ltd [CA Block at Champajhar] | AR @1600 | 2.45 | 3920 |
7 | BJP | 2022-23 | Fulbadi | Belkundi Iron Mines O.M.D.C. Ltd [CA RDF at Fulbadi] | ANR @200 | 23.194 | 4639 |
8 | BJP | 2022-23 | Talapada CA RDF | Joda Bamebari Express Way under SE Railway [CA RDF at Talapada] | ANR @200 | 1.3 | 260 |
9 | BJP | 2022-23 | Imeri | Dalki Mn.Mines of /s BPME Ltd [CA RDF at Imeri] | ANR @200 | 0.66 | 132 |
10 | BJP | 2022-23 | Benidihi | Roida ‘C’ Iron & Mn. Mines of OMC by IDC [CA RDF at Benidihi] | ANR @200 | 50 | 10000 |
11 | BJP | 2022-23 | Jantari | Balda Block Iron Ore Mines by M/s. Sirajudinn & Co. [CA RDF at Jantari] | ANR @200 | 22.8392 | 4568 |
12 | BJP | 2022-23 | Tiriba | Iron & Mn. Ore Mines in Bamebari, Jaribahal etc. by M/s TISCO Ltd. [CA RDF at Tiriba] | ANR @200 | 40.66 | 8132 |
13 | BJP | 2022-23 | Talabaitarani | Joda East Iron & Mn. Mines of M/S Tisco Ltd. [CA RDF at Talabaitarani] | ANR @200 | 13.48 | 2696 |
14 | BJP | 2022-23 | Guptaganga | Iron & Mn. Mines of village Dalpahar & Baitarani RF by R.B. Das [CA RDF at Guptaganga] | ANR @200 | 3.63 | 726 |
15 | BJP | 2022-23 | Guptaganga | Iron Ore Mn. Mines in village Naibuga & Katupali by Tarani Prasad Mohanty [CA RDF at Guptaganga] | ANR @200 | 26.89 | 5378 |
16 | BJP | 2022-23 | Panasuan | Putulipani Iron Mines of M/s Gandhamardan Sponge Iron Industry [CA RDF at Panasuan] | ANR @400 | 11.7464 | 4699 |
17 | BJP | 2022-23 | Lungajhar | Jhiling long lota Iron & Mn. Mines M/S Essel [CA RDF at Lungajhar] | ANR @200 | 1 | 200 |
18 | BJP | 2022-23 | Mundula RF | Diversion of 111.407 ha forest land for rehabilitation and up-gradation of Singhra-Binjabahal Section NH-6 from Km310.806 to 414.982 within the jurisdiction of Keonjhar Division(100.071ha) & Karanjia Division (11.336ha) [CA RDF at Mundula RF] | ANR @400 | 26 | 10400 |
19 | BJP | 2022-23 | Kuanr DPF | CAMPA 200 | ANR | 50 | 10000 |
20 | BJP | 2022-23 | Lungajhar KF -Rangadihi Kha | CAMPA- ANR Vanya Silk | Vanya Silk @500 | 6 | 3000 |
21 | BJP | 2022-23 | Sanaghagara DPF-Nitigotha | CAMPA- ANR Vanya Silk | Vanya Silk @500 | 6 | 3000 |
22 | BJP | 2022-23 | Kuanr DPF | CAMPA- ANR Vanya Silk | Vanya Silk @500 | 7 | 3500 |
23 | BJP | 2022-23 | Talachampei-Sanaradhuan | MGNREGA Ave | Avenue | 12 | 3000 |
24 | BJP | 2023-24 | Anasuan | Diversion of 61.534 ha Forest Land in Baitarani Iron Ore Mines of Dr. Sarajoni Pradhan | CA ANR @200 | 55.084 | 11017 |
25 | BJP | 2023-24 | Champajhar | Diversion of 61.534 ha Forest Land in Baitarani Iron Ore Mines of Dr. Sarajoni Pradhan | CA ANR @200 | 2.5 | 500 |
26 | BJP | 2023-24 | Jatra CA | Diversion of 76.7206 ha Forest Land in Gandhamardan Block-A Iron Ore Mines by M/s OMC Ltd. | CA ANR @200 | 76.7206 | 15344 |
27 | BJP | 2023-24 | Fuljhar | Diversion of 345.189 ha forest land in Khandbandh Ir. Ore Mines of M/s OMC Ltd. | CA ANR @400 | 46.397 | 18559 |
28 | BJP | 2023-24 | Kakharua DPF-Coupe No- KKR-II | CAMPA ANR-500 | ANR @500 | 50 | 25000 |
29 | BJP | 2023-24 | Lungahar-II- Coupe No- KND-II | CAMPA ANR-500 | ANR @500 | 100 | 50000 |
30 | BJP | 2023-24 | Kakharua DPF-Coupe No- KKR-II | CAMPA Fodder & Fruit-500 | ANR @500 | 100 | 50000 |
31 | BJP | 2024-25 | Benidihi | Utility Corridor Khandabandha Mines by Tata Steel Ltd | CA ANR @400 | 2.836 | 1134 |
32 | BJP | 2024-25 | Benidihi | Utility Corridor Khandabandha Mines by Tata Steel Ltd | CA ANR without | 15 | 0 |
33 | BJP | 2024-25 | Champei | Transfer of FC of Nuagon Iron Mines to M/s JSW Steel Ltd of Champei | ACA ANR @200 | 63.3 | 12660 |
34 | BJP | 2024-25 | Fuljhar | Diversion of 63.30 Ha. Sabik Forest Land in addition to 371.192 ha already divered Forest Land of Nuagon Iron Mines to M/s JSW Steel Ltd | CA ANR without | 63.3 | 0 |
35 | BJP | 2024-25 | Bali | Transfer of FC of Nuagon Iron Mines to M/s JSW Steel Ltd at Fuljhar | CA ANR without | 30.961 | 0 |
36 | BJP | 2024-25 | Bali- Newly added | Transfer of FC of Nuagon Iron Mines to M/s JSW Steel Ltd | CA ANR @200 | 64 | 12800 |
37 | BJP | 2024-25 | Kuanr DPF | Transfer of FC of Nuagon Iron Mines to M/s JSW Steel Ltd of Kuanr DPF | ACA AR @1000 | 31 | 31000 |
38 | BJP | 2024-25 | Fulbadi | Transfer of FC of Narayanposi Iron Mines to M/s JSW Steel Ltd | CA AR @1000 | 26 | 26000 |
39 | BJP | 2024-25 | Sanaghagara DPF-Jaladihi | Road for transportation of Ore from Gandhamardan Mines by OMC, Bamboo Plantation | Bamboo @400 | 15.15 | 6060 |
40 | BJP | 2024-25 | Bijagotha Chhak to Danagadi Chhak | MGNREGA | Avenue | 5 | 1250 |
41 | BJP | 2024-25 | Anjar RF | SDMF | Tala Plantation | 444 | 444 |
42 | BJP | 2024-25 | Jagar RF | SDMF | Tala Plantation | 294 | 294 |
43 | BJP | 2024-25 | Kanjipani RF | SDMF | Tala Plantation | 1044 | 1044 |
44 | BJP | 2024-25 | Khajurimundi RF | SDMF | Tala Plantation | 306 | 306 |
45 | BJP | 2024-25 | Mundula RF | SDMF | Tala Plantation | 1020 | 1020 |
46 | BJP | 2024-25 | Saharpur RF | SDMF | Tala Plantation | 888 | 888 |
47 | BJP | 2024-25 | Amuni PRF | SDMF | Tala Plantation | 228 | 228 |
48 | BJP | 2024-25 | Danla PRF | SDMF | Tala Plantation | 312 | 312 |
49 | BJP | 2024-25 | Digchampei PRF | SDMF | Tala Plantation | 300 | 300 |
50 | BJP | 2024-25 | Gonasika PRF | SDMF | Tala Plantation | 456 | 456 |
51 | BJP | 2024-25 | Goudachampei PRF | SDMF | Tala Plantation | 630 | 630 |
52 | BJP | 2024-25 | Lunaghar(II) PRF | SDMF | Tala Plantation | 624 | 624 |
53 | BJP | 2024-25 | Raigoda PRF | SDMF | Tala Plantation | 708 | 708 |
54 | BJP | 2024-25 | Suakati (I) PRF | SDMF | Tala Plantation | 942 | 942 |
55 | BJP | 2024-25 | Suakati(II) PRF | SDMF | Tala Plantation | 240 | 240 |
56 | BJP | 2024-25 | Anjar RF near vill- Anjar Munda Sahi | SSWLCP | Fruit Bearing | 100 | 100 |
Total | 424539 |
Sl.No | Name of the Range | YEAR | Location (Village/Town/RF Etc) | Name of the Scheme | Type of Plantation | Area (Ha. /Rkm) | Seedlings Planted |
---|---|---|---|---|---|---|---|
1 | Champua | 2021-22 | Chamakpur | Rehabilitation & Up-gradation of NH-6 (Binjabahal-Teleibani) Chamakpur PRF | ANR @200 | 128.188 | 25638 |
2 | Champua | 2021-22 | Kalikaprasad RF | Rehabilitation & Up-gradation of NH-6 (Binjabahal-Teleibani) Kalikaprasad RF | ANR @400 | 96.14 | 38456 |
3 | Champua | 2021-22 | Kalikaprasad RF | Rehabilitation & Up-gradation of NH-6 (Singara-Binjabahal) Kalikaprasad RF | ANR @400 | 17.005 | 6802 |
4 | Champua | 2021-22 | Kaunrikala Patrasahi -Kaunrikala Patrasahi VF | AJY CAMPA | ANR | 40 | 8000 |
5 | Champua | 2021-22 | Pokharia -Pokharia V.F | AJY CAMPA | ANR | 40 | 8000 |
6 | Champua | 2022-23 | Kaliapal | Diversion of 360.01 ha forest land in Katamati Iron Mines of M/s Tata Steel Ltd. [CA RDF at Kaliapal] | ANR @400 | 7.793 | 3117 |
7 | Champua | 2022-23 | Kaliapal | Diversion of 360.01 ha forest land in Katamati Iron Mines of M/s Tata Steel Ltd. | CA ANR without | 158 | 0 |
8 | Champua | 2022-23 | Godatopa | Thakurani Iron Ore Mines by Kaypee Entr. [CA RDF at Godatopa] | CA ANR without | 10.7039 | 0 |
9 | Champua | 2022-23 | Dhanurjaypur | Thakurani Iron Ore Mines by Kaypee Entr. [CA RDF at Dhanurjaypur] | CA ANR without | 96.3153 | 0 |
10 | Champua | 2022-23 | Within Lease area | M/s Niranjan Pattnaik in Jurudi Mines (Within Lease Area | ANR @200 | 3.29 | 658 |
11 | Champua | 2022-23 | Gurutuan, Basantapur & Nibuga | Joda East Iron & Mn. Mines of M/S Tisco Ltd. [CA RDF at Gurutuan, Basantapur & Nibuga] | ANR @400 | 8.4561 | 3382 |
12 | Champua | 2022-23 | Kalikaprasad | Diversion of 111.407 ha forest land for rehabilitation and up-gradation of Singhra-Binjabahal Section NH-6 from Km310.806 to 414.982 within the jurisdiction of Keonjhar Division(100.071ha) & Karanjia Division (11.336ha) [CA RDF at Kalikaprasad] | ANR @400 | 139.932 | 55973 |
13 | Champua | 2022-23 | Chamakpur PRF | Diversion of 111.407 ha forest land for rehabilitation and up-gradation of Singhra-Binjabahal Section NH-6 from Km310.806 to 414.982 within the jurisdiction of Keonjhar Division(100.071ha) & Karanjia Division (11.336ha) [CA RDF at Chamakpur PRF] | ANR @200 | 147.496 | 29499 |
14 | Champua | 2022-23 | Chamakpur PRF | Diversion of 111.407 ha forest land for rehabilitation and up-gradation of Singhra-Binjabahal Section NH-6 from Km310.806 to 414.982 within the jurisdiction of Keonjhar Division(100.071ha) & Karanjia Division (11.336ha) [CA RDF at Chamakpur PRF] | ANR @200 | 22.672 | 4534 |
15 | Champua | 2022-23 | Baitarani Esat | Diversion of 360.01 ha forest land in Katamati Iron Mines of M/s Tata Steel Ltd. [1.5SZ RDF at Baitarani Esat] | ANR @200 | 3.3 | 660 |
16 | Champua | 2022-23 | Champua | GMM UTP | Urban | 10000 Nos | 10000 |
17 | Champua | 2022-23 | Kemidiha (Rengalbedasahi) VF | GMM | AR @1600 | 12 | 19200 |
18 | Champua | 2022-23 | Bankia VF | GMM | AR @1600 | 8 | 12800 |
19 | Champua | 2022-23 | Makundapur | CSR by OMC | AR @1600 | 22 | 35200 |
20 | Champua | 2022-23 | Basudevpur-Karanjia | MGNREGA Ave | Avenue | 20 | 5000 |
21 | Champua | 2022-23 | Kainta-Panchapokharia | MGNREGA Ave | Avenue | 4 | 1000 |
22 | Champua | 2023-24 | Baitarani East-B PRF | Diversion of 345.189 ha forest land in Khandbandh Ir. Ore Mines of M/s OMC Ltd. | ACA ANR @400 | 104.3 | 41720 |
23 | Champua | 2023-24 | Baitarani East-B PRF | Diversion of 3.665 ha forest land for laying 33 KV DC Transmission line from MRSS, Joda to Khandbandh by M/s Tata Steel Ltd | ACA ANR @400 | 11 | 4400 |
24 | Champua | 2023-24 | Baitarani East-B PRF | Diversion of 4.680 ha forest land for construction of Conveyor Corridor from Khandbandh Iron Ore Mine to Railway Siding of Joda East Iron Ore Mines of M/s Tata Steel Ltd. | ACA ANR @600 | 10 | 6000 |
25 | Champua | 2023-24 | Kasia | Diversion of 22.368 ha of forest land for 33 KV Power Transmission Line from Jaroli Sub-station to PMPL plant at Basantapur of Essel Mining & Industries Ltd | CA ANR @400 | 36.6803 | 14672 |
26 | Champua | 2023-24 | SZ area | Diversion of 61.534 ha forest lad in Baitarani Iron Ore Mines of Dr. Sarajoni Pradhan [SZ Area] | SZ ANR @200 | 3.863 | 773 |
27 | Champua | 2023-24 | Baitarani East A PRF | Diversion of 345.189 ha forest land in Khandbandh Ir. Ore Mines of M/s OMC Ltd. | 1.5 SZ ANR @400 | 10.38 | 4152 |
28 | Champua | 2023-24 | Gap Plantation 100 mtr outer perimeter of ML area | Diversion of 345.189 ha forest land in Khandbandh Ir. Ore Mines of M/s OMC Ltd. | CA Other ANR @400 | 16.136 | 6454 |
29 | Champua | 2023-24 | Baitarani PRF near Miringisingha | Diversion of 183.218 ha of forest land in Banspani Iron Ore Mines of M/s OMC Ltd | 1.5 SZ ANR @400 | 19.575 | 7830 |
30 | Champua | 2023-24 | Right way under the transmission line | Diversion of 3.665 ha forest land for laying 33 KV DC Transmission line from MRSS, Joda to Khandbandh by M/s Tata Steel Ltd | CA Dwarf Tree-200 | 2.199 | 440 |
31 | Champua | 2023-24 | Right way under the transmission line | Diversion of 22.368 ha of forest land for 33 KV Power Transmission Line from Jaroli Sub-station to PMPL plant at Basantapur in Keonjhar Forest Division of Essel Mining & Industries Ltd. | CA Dwarf Tree-200 | 4.491 | 899 |
32 | Champua | 2023-24 | Patuakudar | Diversion of 22.368 ha of forest land for 33 KV Power Transmission Line from Jaroli Sub-station to PMPL plant at Basantapur of Essel Mining & Industries Ltd | CA AR @1000 | 8.0557 | 8056 |
33 | Champua | 2023-24 | Mankadia hudi near village Parasala & Sarupada | IGC Baldhill | AR @1600 | 10 | 16000 |
34 | Champua | 2023-24 | Parbatipur | CSR by OMC | AR @1600 | 10 | 16000 |
35 | Champua | 2023-24 | Chamakpur PRF | CAMPA ANR-500 | ANR @500 | 50 | 25000 |
36 | Champua | 2024-25 | Chamakpur PRF/Laxmiposi RF | Proposal for prospecting of minerals over 8.214 ha forest land in Khandadhar Sub-Block-G Iron Block by OMECL | Prosp. AR Other @1000 | 3.85 | 3850 |
37 | Champua | 2024-25 | Baitarani A RF | Utility Corridor Khandabandha Mines by Tata Steel Ltd | AR Dwarf Tree-1000 | 0.784 | 784 |
38 | Champua | 2024-25 | Baitarani A RF | Utility Corridor Khandabandha Mines by Tata Steel Ltd | ANR Dwarf Tree-600 | 3.135 | 1881 |
39 | Champua | 2024-25 | Pedipokhari RF | Dubuna Sakradihi Iron & Mn Mines by M/s OMC Ltd, within 100 meter from outer perimeter | ANR Other @500 | 84.861 | 42431 |
40 | Champua | 2024-25 | Chamakpur | Dubuna Sakradihi Iron & Mn Mines by M/s OMC Ltd | 1.5 SZ AR @1000 | 31.981 | 31981 |
41 | Champua | 2024-25 | Bhudaposi chhak to Dhatika | MGNREGA | Avenue | 5 | 1250 |
42 | Champua | 2024-25 | Balibandha RF | SDMF | Tala Plantation | 1014 | 1014 |
43 | Champua | 2024-25 | Bardhana RF | SDMF | Tala Plantation | 1272 | 1272 |
44 | Champua | 2024-25 | Kalikaprasad RF | SDMF | Tala Plantation | 1188 | 1188 |
45 | Champua | 2024-25 | Laxmiposi RF | SDMF | Tala Plantation | 1092 | 1092 |
46 | Champua | 2024-25 | Mooney RF | SDMF | Tala Plantation | 240 | 240 |
47 | Champua | 2024-25 | Naibuga RF | SDMF | Tala Plantation | 594 | 594 |
48 | Champua | 2024-25 | Pedipokhari RF | SDMF | Tala Plantation | 1074 | 1074 |
49 | Champua | 2024-25 | Ukhunda RF | SDMF | Tala Plantation | 762 | 762 |
50 | Champua | 2024-25 | Baitarani East (A) PRF | SDMF | Tala Plantation | 462 | 462 |
51 | Champua | 2024-25 | Baitarani East (B) PRF | SDMF | Tala Plantation | 474 | 474 |
52 | Champua | 2024-25 | Baitarani B- RF | SSWLCP | Ficus Species | 0 | 100 |
53 | Champua | 2024-25 | Baitarani B- RF | SSWLCP | Ficus Species | 0 | 100 |
54 | Champua | 2024-25 | Baitarani B- RF | SSWLCP | Fruit Bearing trees along 10 streams | 0 | 1000 |
55 | Champua | 2024-25 | Baitarani B- RF | SSWLCP | Seed Ball (Bamboo) | 0 | 5000 |
56 | Champua | 2024-25 | Baitarani B- RF | SSWLCP | Siali @200 | 25 | 5000 |
57 | Champua | 2024-25 | Baitarani B- RF | SSWLCP | Sala @500 | 10 | 5000 |
Total | 526864 |
Sl.No | Name of the Range | Year | Location (Village/Town/RF Etc) | Name of the Scheme | Type of Plantation | Area (Ha. /Rkm) | Seedlings Planted |
---|---|---|---|---|---|---|---|
1 | Ghatagaon | 2022-23 | Barabank RF Patch-I | Diversion of 360.01 ha forest land in Katamati Iron Mines of M/s Tata Steel Ltd. [ACA RDF at Barabank RF Patch-I] | ANR @400 | 48.28 | 19312 |
2 | Ghatagaon | 2022-23 | Barabank RF Patch-II | Diversion of 360.01 ha forest land in Katamati Iron Mines of M/s Tata Steel Ltd. [ACA RDF at Barabank RF Patch-II] | ANR @400 | 60.207 | 24083 |
3 | Ghatagaon | 2022-23 | Balipokhari RF | Diversion of 360.01 ha forest land in Katamati Iron Mines of M/s Tata Steel Ltd. [ACA RDF at Balipokhari RF] | ANR @200 | 97.567 | 19513 |
4 | Ghatagaon | 2022-23 | Barabank RF | Diversion of 360.01 ha forest land in Katamati Iron Mines of M/s Tata Steel Ltd. [1.5SZ RDF at Barabank RF] | ANR @400 | 4.737 | 3790 |
5 | Ghatagaon | 2022-23 | Masinabilla RF | Diversion of 12.75 ha forest land for prospecting of minerals in Mankadchua Iron Block by Directorate of Geplogy [Tall Tree at Masinabilla RF] | Urban | 600 Nos | 600 |
6 | Ghatagaon | 2022-23 | Atei RF (Comp No.33 & 34) Kadabahali | CAMPA 200 | ANR | 200 | 40000 |
7 | Ghatagaon | 2022-23 | Barabanka RF Medinipur | CAMPA- ANR Vanya Silk | Vanya Silk @500 | 15 | 7500 |
8 | Ghatagaon | 2022-23 | Barabanka RF- Gadadhar Pur | CAMPA- ANR Vanya Silk | Vanya Silk @500 | 16 | 8000 |
9 | Ghatagaon | 2022-23 | Manaharpur VF | CAMPA- ANR Vanya Silk | Vanya Silk @500 | 10 | 5000 |
10 | Ghatagaon | 2022-23 | Kapaspada DPF | CAMPA- ANR Vanya Silk | Vanya Silk @500 | 11 | 5500 |
11 | Ghatagaon | 2022-23 | Gopinathapur-Balipokhari | MGNREGA Ave | Avenue | 5 | 1250 |
12 | Ghatagaon | 2022-23 | Kusunupur-Baiganpal | MGNREGA Ave | Avenue | 20 | 5000 |
13 | Ghatagaon | 2022-23 | Sanabarabeda-Masinabill | MGNREGA Ave | Avenue | 5 | 1250 |
14 | Ghatagaon | 2022-23 | Atei RF Murgapahadi | MGNREGA ANR | ANR | 100 | 20000 |
15 | Ghatagaon | 2021-22 | Khandiguda Sahi (Baiganpal) -Atei RF | AJY CAMPA | ANR | 55 | 11000 |
16 | Ghatagaon | 2021-22 | Pipilia -Pipilia RF | AJY CAMPA | ANR | 50 | 10000 |
17 | Ghatagaon | 2023-24 | TARA “B” DPF-BLJ-I | CAMPA ANR-500 | ANR @500 | 50 | 25000 |
18 | Ghatagaon | 2023-24 | Ghatagaon to Dubulabeda | MGNREGA Avenue | Avenue | 10 | 2500 |
19 | Ghatagaon | 2023-24 | Balipokhari to Barhatipura | MGNREGA Avenue | Avenue | 5 | 1250 |
20 | Ghatagaon | 2023-24 | Sanamasinabilla | MGNREGA River Side | River Side | 2 | 400 |
21 | Ghatagaon | 2024-25 | Barabank RF | Railway project from Jaroli to Porjanpur in Jakhapura – Bansapani Broad Gague Railway line by East Coast Railway | CA ANR @400 | 186 | 74400 |
22 | Ghatagaon | 2024-25 | Masinabila RF | Utility Corridor Khandabandha Mines by Tata Steel Ltd | ACA ANR @800 | 21 | 16800 |
23 | Ghatagaon | 2024-25 | Masinabilla RF | Proposal for prospecting of minerals over 14.699 ha forest land in Guali Iron Block by OMC | Prosp. AR Other @1000 | 13.42 | 13420 |
24 | Ghatagaon | 2024-25 | Nalapanga RF Rangamatia | CAMPA ANR | ANR @500 | 100 | 50000 |
25 | Ghatagaon | 2024-25 | Deobandha Chhak to Binida | MGNREGA | Avenue | 10 | 2500 |
26 | Ghatagaon | 2024-25 | Barahatipura to Dhenkikote | MGNREGA | Avenue | 15 | 3750 |
27 | Ghatagaon | 2024-25 | Atei RF | SDMF | Tala Plantation | 1400 | 1400 |
28 | Ghatagaon | 2024-25 | Badamasinabilla RF | SDMF | Tala Plantation | 192 | 192 |
29 | Ghatagaon | 2024-25 | Balipokhari RF | SDMF | Tala Plantation | 756 | 756 |
30 | Ghatagaon | 2024-25 | Kalimati RF | SDMF | Tala Plantation | 816 | 816 |
31 | Ghatagaon | 2024-25 | Laxmiposi RF | SDMF | Tala Plantation | 150 | 150 |
32 | Ghatagaon | 2024-25 | Pipilia RF | SDMF | Tala Plantation | 1410 | 1410 |
Total | 376542 |
Sl.No | Name of the Range | YEAR | Location (Village/Town/RF Etc) | Name of the Scheme | Type of Plantation | Area (Ha. /Rkm) | Seedlings Planted |
---|---|---|---|---|---|---|---|
1 | Keonjhar | 2021-22 | Handibhanga -Jadipada RF | AJY CAMPA | ANR | 50 | 10000 |
2 | Keonjhar | 2021-22 | Keri -Maidankel RF | AJY CAMPA | ANR | 50 | 10000 |
3 | Keonjhar | 2021-22 | Belda RF | CSR by OMC | AR @1600 | 20 | 32000 |
4 | Keonjhar | 2022-23 | Jadipada RF | RML Iron Mines in Sidhamath RF of M/s MESCO (Mideast) [PCA RDF at Jadipada RF] | ANR @200 | 15 | 3000 |
5 | Keonjhar | 2022-23 | Raikala RF | CAMPA 200 | ANR | 50 | 10000 |
6 | Keonjhar | 2022-23 | Barabanka RF | CAMPA 200 | ANR | 50 | 10000 |
7 | Keonjhar | 2022-23 | Basantapur RF- Badapichhulabeda | CAMPA- ANR Vanya Silk | Vanya Silk @500 | 12 | 6000 |
8 | Keonjhar | 2022-23 | Sapua Dam-Kuladhankuni | MGNREGA Ave | Avenue | 10 | 2500 |
9 | Keonjhar | 2022-23 | Barabanka RF | MGNREGA ANR | ANR | 50 | 10000 |
10 | Keonjhar | 2023-24 | Barabanka RF | Diversion of 61.534 ha Forest Land in Baitarani Iron Ore Mines of Dr. Sarajoni Pradhan | PCA ANR @200 | 30.09 | 6018 |
11 | Keonjhar | 2023-24 | Poipani RF | Diversion of 61.534 ha forest lad in Baitarani Iron Ore Mines of Dr. Sarajoni Pradhan | 1.5 SZ AR @1600 | 5.7945 | 9271 |
12 | Keonjhar | 2023-24 | Belda RF | Prospecting of minerals in forest land over 28.946 ha in Bserenda- Bhadrasahi iron ore & Mn mining lease for undertaking 190 boreholes of 4″ dia by M/s OMC Ltd. At | CA Other -Urban | 20900 Nos | 20900 |
13 | Keonjhar | 2023-24 | Belda RF | Prospecting of Minerals in forest land over 4.643 ha in Balda-Palsa- Jajanga Iron Ore mining lease for undertaking 66 boreholes of 4″ ia by M/s OMC Ltd | CA Other -Urban | 7260 Nos | 7260 |
14 | Keonjhar | 2023-24 | Belda RF (0.481ha) | Prospecting of Minerals in forest lan over 0.684 hain Jajanga Manganese ore mining lease for undertaking 07 boreholes of 4″ dia by M/s OMC Ltd | CA Other AR @1600 | 0.481 | 770 |
15 | Keonjhar | 2023-24 | Belda RF (8.00ha) | Prospecting of Minerals in forest land over 15.234 ha in Thakurani Block A Iron Ore Mining lease for undertaking 113 boreholes of 4″ dia by IDCOL Ltd | CA Other AR @1600 | 8 | 12800 |
16 | Keonjhar | 2023-24 | Belda RF (1.65 ha) | Prospecting of Minerals in forest land over 1.439 ha in Thakurani Iron Ore Block for undertaking 24 boreholes of 4″ dia by M/s OMECL Ltd. | CA Other AR @1600 | 1.65 | 2640 |
17 | Keonjhar | 2023-24 | Panasia [Gramya Jungle] | CSR by OMC | AR @1600 | 12 | 19200 |
18 | Keonjhar | 2023-24 | Panasia [Gramya Jungle] | CSR by OMC | AR @1600 | 8 | 12800 |
19 | Keonjhar | 2023-24 | Tentalaposi to Khuntabandh | MGNREGA Avenue | Avenue | 10 | 2500 |
20 | Keonjhar | 2024-25 | Nalapanga RF | Railway project from Jaroli to Porjanpur in Jakhapura – Bansapani Broad Gague Railway line by East Coast Railway | CA ANR @800 | 23.5 | 18800 |
21 | Keonjhar | 2024-25 | Nelung RF | Railway project from Jaroli to Porjanpur in Jakhapura – Bansapani Broad Gague Railway line by East Coast Railway | ACA ANR @800 | 23.5 | 18800 |
22 | Keonjhar | 2024-25 | Raghunathpur RF | Railway project from Jaroli to Porjanpur in Jakhapura – Bansapani Broad Gague Railway line by East Coast Railway | ACA ANR @800 | 23.5 | 18800 |
23 | Keonjhar | 2024-25 | Tangarani RF | Railway project from Jaroli to Porjanpur in Jakhapura – Bansapani Broad Gague Railway line by East Coast Railway | ACA ANR @800 | 23.5 | 18800 |
24 | Keonjhar | 2024-25 | Basantapur RF | CAMPA ANR | CAMPA ANR 500 | 20 | 10000 |
25 | Keonjhar | 2024-25 | Srirampur to Raikala | MGNREGA | Avenue | 5 | 1250 |
26 | Keonjhar | 2024-25 | Balabhadrapur RF | SDMF | Tala Plantation | 258 | 258 |
27 | Keonjhar | 2024-25 | Basantapur RF | SDMF | Tala Plantation | 372 | 372 |
28 | Keonjhar | 2024-25 | Jadipada RF | SDMF | Tala Plantation | 612 | 612 |
29 | Keonjhar | 2024-25 | Maidankela RF | SDMF | Tala Plantation | 546 | 546 |
30 | Keonjhar | 2024-25 | Nayagarh RF | SDMF | Tala Plantation | 1140 | 1140 |
31 | Keonjhar | 2024-25 | Nelung RF | SDMF | Tala Plantation | 504 | 504 |
32 | Keonjhar | 2024-25 | Raghunathpur RF | SDMF | Tala Plantation | 1812 | 1812 |
33 | Keonjhar | 2024-25 | Raikala RF | SDMF | Tala Plantation | 1458 | 1458 |
34 | Keonjhar | 2024-25 | Tangarani RF | SDMF | Tala Plantation | 816 | 816 |
Total | 281627 |
Sl.No | Name of the Range | YEAR | Location (Village/Town/RF Etc) | Name of the Scheme | Type of Plantation | Area (Ha. /Rkm) | Seedlings Planted |
---|---|---|---|---|---|---|---|
1 | Patna | 2021-22 | Banbir -Banbir VF | AJY CAMPA | ANR | 80 | 16000 |
2 | Patna | 2021-22 | Balaniposi -Balanipos VF | AJY CAMPA | ANR | 35 | 7000 |
3 | Patna | 2022-23 | Chemena | CSR by OMC | AR @1600 | 8 | 12800 |
4 | Patna | 2022-23 | Atei RF | CAMPA 200 | ANR | 100 | 20000 |
5 | Patna | 2022-23 | Mangalpur-Bhimakund | MGNREGA Ave | Avenue | 20 | 5000 |
6 | Patna | 2022-23 | Khajuridiha-Udayapur | MGNREGA Ave | Avenue | 8 | 2000 |
7 | Patna | 2023-24 | Padmapur RF | IGC AR | AR @1600 | 10 | 16000 |
8 | Patna | 2023-24 | Malarpada-Banamalipur | CSR by OMC | AR @1600 | 10 | 16000 |
9 | Patna | 2023-24 | Begana | CSR by OMC | AR @1600 | 5 | 8000 |
10 | Patna | 2023-24 | Padmapur RF | CSR by OMC | AR @1600 | 5 | 8000 |
11 | Patna | 2023-24 | Saharpada DPF | CAMPA ANR-500 | ANR @500 | 50 | 25000 |
12 | Patna | 2023-24 | Saharpada to Tendara | MGNREGA Avenue | Avenue | 10 | 2500 |
13 | Patna | 2023-24 | Gidhibasa to Tentulikhunti | MGNREGA Avenue | Avenue | 10 | 2500 |
14 | Patna | 2023-24 | Gorandijodi to Sankhua | MGNREGA Avenue | Avenue | 10 | 2500 |
15 | Patna | 2023-24 | Nuagaon to Kumulabahali | MGNREGA Avenue | Avenue | 5 | 1250 |
16 | Patna | 2023-24 | Tribindha- 500 Nos Trees | MGNREGA River Side | River Side | 1 | 500 |
17 | Patna | 2024-25 | Poipani | Transfer of FC of Narayanposi Iron Mines to M/s JSW Steel Ltd | ACA ANR @500 | 55.5 | 27750 |
18 | Patna | 2024-25 | Padmapur RF | Proposal for prospecting of minerals over 3.905 ha forest land in Thakurani Iron Block by OMC | Pros. AR @1600 | 2.5 | 4000 |
19 | Patna | 2024-25 | Padmapur RF | Proposal for prospecting of minerals over 3.905 ha forest land in Thakurani Iron Block by OMC | Pros. ANR @500 | 2 | 1000 |
20 | Patna | 2024-25 | Billa | Proposal for prospecting of minerals over 12.27 ha forest land in SGBK Iron Block by OMC | Pros. ANR @500 | 20 | 10000 |
21 | Patna | 2024-25 | Nayajagannathpur DPF | Proposal for prospecting of minerals over 12.27 ha forest land in SGBK Iron Block by OMC | Pros. ANR @500 | 20 | 10000 |
22 | Patna | 2024-25 | Paitamaja DPF | Proposal for prospecting of minerals over 12.27 ha forest land in SGBK Iron Block by OMC | Pros. ANR @500 | 48 | 24000 |
23 | Patna | 2024-25 | Purunapani RF | CSR by OMC | AR @1600 | 2 | 3200 |
24 | Patna | 2024-25 | Silipada to Udaypur | MGNREGA | Avenue | 5 | 1250 |
25 | Patna | 2024-25 | Baratunia to Tendra | MGNREGA | Avenue | 5 | 1250 |
26 | Patna | 2024-25 | Dwarikaposi Chhak to Toranipokhari | MGNREGA | Avenue | 5 | 1250 |
27 | Patna | 2024-25 | Barudiposi to Chilida | MGNREGA | Avenue | 5 | 1250 |
28 | Patna | 2024-25 | Rengalbeda to Baliaposi | MGNREGA | Avenue | 5 | 1250 |
29 | Patna | 2024-25 | Atei RF | SDMF | Tala Plantation | 494 | 494 |
30 | Patna | 2024-25 | Barbil RF | SDMF | Tala Plantation | 72 | 72 |
31 | Patna | 2024-25 | Belposi RF | SDMF | Tala Plantation | 252 | 252 |
32 | Patna | 2024-25 | Billa(A) RF | SDMF | Tala Plantation | 216 | 216 |
33 | Patna | 2024-25 | Chemna(A) RF | SDMF | Tala Plantation | 150 | 150 |
34 | Patna | 2024-25 | Ninua RF | SDMF | Tala Plantation | 150 | 150 |
35 | Patna | 2024-25 | Patna RF | SDMF | Tala Plantation | 2208 | 2208 |
36 | Patna | 2024-25 | Purunapani RF | SDMF | Tala Plantation | 648 | 648 |
Total | 235440 |
Sl.No | Name of the Range | YEAR | Location (Village/Town/RF Etc) | Name of the Scheme | Type of Plantation | Area (Ha. /Rkm) | Seedlings Planted |
1 | Telkoi | 2021-22 | Patkilpur Burusahi -Patkilpur Burusahi- Kalapat RF | AJY CAMPA | ANR | 50 | 10000 |
2 | Telkoi | 2021-22 | Gopinathpur -Bandhanjhari RF | AJY CAMPA | ANR | 50 | 10000 |
3 | Telkoi | 2022-23 | Damdargouni | Diversion of 360.01 ha forest land in Katamati Iron Mines of M/s Tata Steel Ltd. [CA RDF at Damdargouni | ANR @400 | 8.5 | 3400 |
4 | Telkoi | 2022-23 | Damdargouni | Diversion of 360.01 ha forest land in Katamati Iron Mines of M/s Tata Steel Ltd. [CA RDF at Damdargouni | ANR @400 | 25.5 | 10200 |
5 | Telkoi | 2022-23 | Samakoi RF-Deuladiha | CSR by OMC | AR @1600 | 10 | 16000 |
6 | Telkoi | 2022-23 | Samakoi RF-Nuagarh | CSR by OMC | AR @1600 | 10 | 16000 |
7 | Telkoi | 2022-23 | Samakoi RF | CAMPA 200 | ANR | 50 | 10000 |
8 | Telkoi | 2022-23 | Bandhanjhari RF -Baleswar VSS | CAMPA- ANR Vanya Silk | Vanya Silk @500 | 32 | 16000 |
9 | Telkoi | 2022-23 | Siriabahal VF | CAMPA- ANR Vanya Silk | Vanya Silk @500 | 20 | 10000 |
10 | Telkoi | 2022-23 | Kalapat RF (Talapada) | GMM | ANR @200 | 100 | 20000 |
11 | Telkoi | 2022-23 | Talapada to Gurum | MGNREGA Ave | Avenue | 6 | 1500 |
12 | Telkoi | 2022-23 | Ranibeda-Kulanga | MGNREGA Ave | Avenue | 6 | 1500 |
13 | Telkoi | 2022-23 | Bandhanjhari RF | MGNREGA ANR | ANR | 50 | 10000 |
14 | Telkoi | 2022-23 | Kalapat RF RF | MGNREGA ANR | ANR | 50 | 10000 |
15 | Telkoi | 2023-24 | Kuladera to Khajuria | MGNREGA Avenue | Avenue | 3 | 750 |
16 | Telkoi | 2023-24 | Jagmohanpur to Saruali | MGNREGA Avenue | Avenue | 3 | 750 |
17 | Telkoi | 2023-24 | Kantalei to Jamunali Sahi | MGNREGA Avenue | Avenue | 3 | 750 |
18 | Telkoi | 2023-24 | Telkoi | MGNREGA River Side | River Side | 1 | 200 |
19 | Telkoi | 2023-24 | Benamunda RF | CAMPA ANR-500 | ANR @500 | 50 | 25000 |
20 | Telkoi | 2023-24 | Podag DPF | CAMPA Vanyasilk-500 | ANR @500 | 50 | 25000 |
21 | Telkoi | 2023-24 | Rangamatia [CA ANR Without] | Diversion of 3.665 ha forest land for laying 33 KV DC Transmission line from MRSS, Joda to Khandbandh by M/s Tata Steel Ltd | CA ANR without | 3.7 | 0 |
22 | Telkoi | 2023-24 | Rangamatia [CA ANR Without] | Diversion of 4.680 ha forest land for construction of Conveyor Corridor from Khandbandh Iron Ore Mine to Railway Siding of Joda East Iron Ore Mines of M/s Tata Steel Ltd | CA ANR without | 4.68 | 0 |
23 | Telkoi | 2024-25 | Kalapat RF Banda | CAMPA ANR | ANR @500 | 20 | 10000 |
24 | Telkoi | 2024-25 | Tungurubahal DPF | CAMPA ANR | ANR @500 | 20 | 10000 |
25 | Telkoi | 2024-25 | Kalapat RF Galda | CAMPA ANR | ANR @500 | 20 | 10000 |
26 | Telkoi | 2024-25 | Podang to Sankhalei | MGNREGA | Avenue | 4 | 1000 |
27 | Telkoi | 2024-25 | Benamunda RF | SDMF | Tala Plantation | 804 | 804 |
28 | Telkoi | 2024-25 | Chamunda-Golabandha RF | SDMF | Tala Plantation | 210 | 210 |
29 | Telkoi | 2024-25 | Dhanurjayapur RF | SDMF | Tala Plantation | 222 | 222 |
30 | Telkoi | 2024-25 | Jharbeda RF | SDMF | Tala Plantation | 792 | 792 |
31 | Telkoi | 2024-25 | Salaikena-Siriabahal RF | SDMF | Tala Plantation | 324 | 324 |
32 | Telkoi | 2024-25 | Samakoi RF | SDMF | Tala Plantation | 1014 | 1014 |
33 | Telkoi | 2024-25 | Tamanga RF | SDMF | Tala Plantation | 1368 | 1368 |
34 | Telkoi | 2024-25 | Dubulapal PRF | SDMF | Tala Plantation | 204 | 204 |
35 | Telkoi | 2024-25 | Godhihudi PRF | SDMF | Tala Plantation | 360 | 360 |
36 | Telkoi | 2024-25 | Rekuti PRF | SDMF | Tala Plantation | 480 | 480 |
37 | Telkoi | 2024-25 | Sikheswari PRF | SDMF | Tala Plantation | 1182 | 1182 |
Total | 235440 |